Suitable Surfaces
Flooring
- Concrete
- Screed (Anhydrite screeds will require special preparation measures)
- Wood floors (over-boarding with cement boards or sheeted with plywood)
- Levelling compounds (minimum 35Nmm2 strength)
- Over tiles (please speak to a member of our team for a quote)
For a successful flooring system, correct floor preparation needs to be carried out. Failure in the subfloor will result in potential failures with the resin. Resin flooring systems are a thin (3-5mm) decorative coating and are designed as the final finish of a floor. They are not designed to level or rid any undulations with the subfloor. If floors are unlevel and / or undulations exist these are likely to be present in the final finish.
Worktops
Suitable worktops:
- Any new or existing worktop providing a key is provided
- Granite worktops require diamond grinding prior to install
Curing
Cure Time | Temperature |
---|---|
7 days | 25°C |
10 days | 20°C |
15 days | 15°C |
20 days | 10°C |
30 days | 5°C |
WARNING: Resin will not reach full cure / strength with temperatures below 5°C.
During the curing phase sealers are more vulnerable to UV light exposure, scratching and damage.